Professional

Engineering that starts on the site.

ConstruckCalc Professional is the project engineering workspace inside Construck Project Suite. It takes information straight from the site and the project record, builds the ground model, analyses it to the design code that governs your project and returns a reviewed recommendation for every slope.

Part of ConstruckCalc and Construck Project Suite

Schematic: site data flowing into a ground model and slope stability check SITE CAPTUREGPS · heading · photos Ground model Layers & strengthsGroundwaterSections & chainageDesign code STABILITY CHECK · REVIEWED BOREHOLE GROUNDWATER
Two levels of ConstruckCalc

Quick Check opens the conversation. Professional answers the project.

Quick Check gives anyone a first view of suitable systems. When a real project needs a verified answer, Professional takes over, using the project’s own evidence rather than a few screening questions.

Quick Check · free and public

A first direction in minutes

Input
Picture questions and simple geometry
Output
Suitable systems, preliminary quantities, approximate cost
Stability
Not verified: closer review is flagged
Open free Quick Check
Professional · authorized projects

A project-specific, reviewed design

Input
Site captures, survey, boreholes, laboratory results and drawings
Output
Ground model, code-based analysis, system per section, quantities and calculation record
Stability
Analysed for every slope taken forward and reviewed by Construck engineers
Discuss a project
Inside the Suite

Real screens. Live engines.

Professional runs inside Construck Project Suite. These screens come from the Master Portal, where Construck’s engineering team governs the calculation rules and the analysis engines that distributor projects use.

Master Portal
Master Portal: Calculators Control Panel with ConstruckSlope, ConstruckWave and analytical engine modules
Master Portal · Calculators Control Panel
Master Portal
Master Portal: LEM, FEM and Rockfall analysis services showing service reachable
Master Portal · analysis engines: LEM, FEM and Rockfall reachable
Project Suite overview · from site evidence to engineering review and project records
Live in the Master PortalLEM · limit equilibrium and site analysisFEM · finite elements and water moduleRockfall · analysis and barrier checks
Live from the site

The design starts with what is really there.

Site teams capture location, heading and photographs on a phone with Project Suite’s guided Site Location tool. Survey and terrain models, boreholes and laboratory results are added to the same project. Professional reads them where they live, so the model always reflects the latest information from the ground.

  • Captured once, used everywhereField information belongs to the project; engineering, logistics and quality teams all reference the same record.
  • Every value keeps its sourceDocument, page, revision and who supplied it stay attached to each number in the model.
  • Changes trigger reassessmentA new survey, borehole or design change automatically flags the affected sections for controlled review, with full history kept.
Schematic: site sources feed one project record, which Professional reads by reference Site Locationphone · GPS · photosSurvey & terrainGeoTIFF · LAS · DXFInvestigationboreholes · lab · waterProject documentsdrawings · BOQ · chainage Projectrecord one source of truth ConstruckCalcProfessional ground modelanalysis · review RELEASED DESIGN RETURNS TO THE PROJECT
Site Location capture records GPS, heading and photographs for project context
How it works in a project

Six steps from evidence to a released design.

Professional runs inside the project, not beside it. Each step builds on the last, and every decision stays traceable.

Step 01 · Project evidence

Bring the project once.

Survey files, borehole logs, laboratory results, drawings and site captures are uploaded to the project. Professional works from those original files and their revisions; nothing is retyped into a separate calculator.

Project Suite: submitted documents and tracking for a project, with original baseline files and processing status
Project Suite · project documents
Step 02 · Information review

Know what the information really says.

Every document is read and indexed. Values are recorded with their source, page and revision, and each is marked usable, missing, conflicting or still to be confirmed. Receiving a file is never treated as accepting it.

Step 03 · Acquisition

Ask only for what is missing.

When the evidence is not enough for a safe answer, Construck issues a specific request: an extra borehole, a groundwater reading, a survey of one section. The distributor’s response is added to the same record.

Step 04 · Ground model

Build the slope as it is.

Ground layers, strengths, groundwater, benches, faces, loads and earthquake actions come together into an explicit model for each relevant section along the chainage.

Step 05 · Analysis

Run the right method for the problem.

The model is analysed to the project’s design code: limit equilibrium for the whole cut and every face, finite elements where a second opinion is needed, water through a design storm and rockfall where rock is present.

Step 06 · Review & release

An engineer decides, the record shows why.

Construck’s geotechnical team reviews assumptions and results. The approved configuration, drawings and quantities are released back to the project and govern installation, inspection and handover.

Project Suite: shop drawings retrieved from ConstruckCalc Professional for the site team
Project Suite · released drawings from ConstruckCalc
✓Unit weight converted from tonnes per cubic metre to kilonewtonsBorehole log · p.4
✓Bench height within the measured cut heightSurvey · rev B
!Friction angle outside the normal range for this soil: look againLab report · p.12
✓Groundwater level read from the standpipe recordMonitoring · wk 3
?Weathered layer stronger than the rock below: ask an engineerBorehole BH-2
Package status2 items open · analysis held
Checked data

Reads the documents. Questions the numbers.

A document engine reads reports, logs and drawings and proposes each value with its unit, source and confidence. The analytical engine then checks them before anything is calculated.

  • Units converted, unknown units reportedt/m³ to kN/m³, MPa to kPa, millimetres to metres.
  • Missing, unusual and contradictory values flaggedA bench higher than the cut, layers out of order, a weathered layer stronger than fresh rock.
  • The analysis waits until the package is readyEach open item says whether to look again in the documents or ask a person.

Illustrative example. AI assists with reading and organising information; numerical results always come from the stated engineering method and are reviewed by an engineer.

Engineering standards

Designed to the code your project is built under.

The governing design code is set for the project at the start. It fixes the partial factors, the target safety level and the earthquake coefficient used in every check, and it is named in the calculation record, so reviewers and authorities can follow the basis of the recommendation.

Europe and international

Eurocode

  • EN 1997-1 · Eurocode 7Design Approach 1, Combination 2
  • EN 1998-5Earthquake actions on slopes and foundations
United States practice

American practice

  • USACE EM 1110-2-1902Slope stability
  • FHWA GEC 7Soil nail walls
  • AASHTO LRFDLoad and resistance factor design
India

Indian Standards

  • IS 7894Stability analysis of slopes
  • IS 1893Earthquake-resistant design
  • IRC guidelinesHill road slopes
BishopJanbuSpencerMorgenstern–PriceCircular and non-circular slipsStatic and earthquake casesGroundwater and rainfall

Projects governed by other national codes are discussed with Construck’s technical team before the analysis basis is agreed.

Analysis engines

The right method for each question.

Construck’s own engines are checked against published textbook and exact solutions. Each analysis reports every step it takes, so the result can be followed rather than simply trusted.

Limit equilibrium

Bishop, Janbu, Spencer and Morgenstern–Price; circular slips and slips of any shape, including block slides on weak layers; static and earthquake cases.

Designs and checks: Plus 200, Plus 400, Extreme

Finite elements

A second opinion on stability and movement: grids, bolts and anchors with their forces, excavation bench by bench, tension at the crest and earthquake response.

Designs and checks: Grids, rock bolts and anchors

Water through a storm

Groundwater and rainfall followed through the slope hour by hour across a design storm, with the safety factor at each moment and the drain’s capacity checked against the water it carries.

Designs and checks: ConstruckSlope drainage

Rockfall

Thousands of rock paths down the measured profile: how far, how high and how hard they travel, to size and position the right barrier.

Designs and checks: RockBarrier, RockGabion, RockWrap
From analysis to recommendation

The whole cut first. Then every face.

Professional checks the overall slope before looking at each bench face. Each face is then classed as stable, as having a local problem a ConstruckSlope system can address, or as needing regrading before protection. Recommendations follow that logic, never the other way round.

Explore ConstruckSlope systems
Schematic: the whole cut is checked first, then every bench face WHOLE CUT FACE 1 · STABLE FACE 2 · LOCAL PROBLEM FACE 3 · REGRADE FIRST
Classifications follow the project analysis

A system for every stretch

Terrain models and boreholes are cut into sections every few metres along the alignment. Each stretch receives the ConstruckSlope system and configuration that suits its ground, height and water, with quantities taken from the released geometry.

Example: a recommended system for each stretch along the alignment Chainage · example alignmentPlus 200Plus 400ExtremeRockBarrierPlus 2000+0000+3200+6400+9601+280
Plus 200Plus 400ExtremeRockBarrier
The calculation record

A recommendation you can trace.

Every released design comes with a calculation record: the inputs and where they came from, the design values and code, the methods and engines used, the results, the water case, the systems by their Construck identity and the engineer’s sign-off.

  • Already studied? We study it again.Existing investigations and analyses are reviewed and the slope is checked again for the proposed Construck solution.
  • Released, then deliveredApproved drawings, configurations and quantities flow back into Project Suite to govern installation stages, quality holds and handover.

Calculation record

Section CH 0+480 · Face 2
Design code
EN 1997-1 · DA1-C2
Method
Morgenstern–Price
Cases
Static · earthquake · storm
System
ConstruckSlope Plus 400
Sources
BH-2 · Survey rev B
Engineer review
Who it serves

Built for live projects and the people who deliver them.

Distributors

Use Professional on your authorized live projects, with manufacturer engineering behind your local team and free design support within the agreed partnership package.

Become a distribution partner

Contractors and consultants

Bring existing investigations and studies. Receive a further, project-specific stability check and a clear technical basis for the protection scope.

Design & consulting

Owners and authorities

See which evidence supports each decision, which code governs it and how the installed work matches the released design.

Talk to our team

Professional is provided through authorized projects within the agreed scope. Results are reviewed by Construck engineers and support, but do not replace, the project’s designer of record, independent checks and statutory approvals.

Professional

Bring us the project.

Share your site information, drawings and programme with our technical team.